Progress on the Sports Hall |
Ceiling and timber beams above the atrium being prepared for painting |
Progress on a first floor classroom |
The 6th form external terrace |
Progress on a classroom in the East Wing |
Mechanical & Electrical works are in progress, including fitting of sprinkler system.
Internal boarding to walls and ceilings are continuing.
Acoustic separating floor system continuing (screedboard floors to complete as areas become available).
Fitting of vertical slabs to the perimeter of the floor slab is to be completed.
Single ply roof covering is continuing and flashings to complete.
Fitting of air tightness membranes are almost complete.
Fitting of cedar fascias and barge boards are almost complete.
Cape Cod cladding is continuing.
Fitting of render boards and rendering is continuing.
1st coat wall decorations are being carried out as areas become available.
Mrtal framed bulkheads and ceilings being constructed.
Suspended ceiling grids have started.
Wall tiling about to start.
Soil and vent pipes and sink waste pipes being fitted and testing started.
Plumbing panels are continuing.
Works within Atrium is in progress.
External scaffold is being dismantled as required.
Gutter fixing started.
So what's next?
Continue scaffold dismantle, vertical slabs to floor slab, roof coverings, internal wall boarding, mist coat decorations and acoustic floor, 2nd fix Carpentry, M & E works, wall tiling, ceilings, Soil and vent pipes.