Timber frame erection is continuing. Fitting of floor cassettes complete and roof cassettes fitting is in progress. Circular columns fitted to ground floor areas.
Setting up of metal floor ducts has started.
Scaffold erection is continuing as required.
So what's next?
Continue timber frame erection and floor duct fitting.
Walls being erected at first floor around the atrium area |
The scaffold cage and crane |
View of the frame from the entrance towards the atrium |