Progress on site: Science Block: Week 12

Activity/Observations
 Excavation and concreting of foundations, including timber formwork to contain top of concrete pour is continuing.
 Below slab foul drains continuing, ahead of localised concrete foundation pours and water test is in progress.
 Drainage outside of footprint of building has started.
 Shuttering at perimeter of floor slab has started.