Activity/Observations
Excavation and concreting of foundations, including timber formwork to contain top of concrete pour is continuing.
Below slab foul drains continuing, ahead of localised concrete foundation pours and water test is in progress.
Drainage outside of footprint of building has started.
Shuttering at perimeter of floor slab has started.