First floor walls awaiting roof cassette |
![]() |
The same view with roof cassette and roof counterbattens on forming the roof overhangs |
![]() |
Acoustic insulation is added to the ground floor ceilings |
Continue erection of timber frame, now at roof level - roof cassettes now at around 50% complete – roofing counter battens (70mm x 75mm)
Continue second skin sheathing and timber framing - this will form a thermal 'wrap' around the building.
Plinth Damp proof membrane– overlay plinth DPM – install 150mm insulation + slab on edge to form a 300mm high plinth around the building. – now advanced
Internal partition walls and floor zone 1st floor acoustic insulation + netting.
Commence door and window installations
1st fix plumber soil and vent pipes
Air tightness membrane + taping, on-going